Learn about the investments we have co-created
Our projects
Face2Face, Katowice, Grant Thornton
Plumbing
Sewage installation
Fire protection installation
Condensate installation
Ventilation installation
CT and WL installation
Split air conditioning installation for the server room
Area: 1200 square meters
Resi4Rent, Łódź, 127 Kilińskiego Street
Feeding ventilation installation elements by crane:
– Systemair smoke exhaust fans
– bases for fans
– domestic installation fans
– Conlit insulation
– mineral wool insulation
– comfort and smoke exhaust ventilation ducts.
Quattro Business Park A, Kraków, 25 Al. Gen. Bora-Komorowskiego
Dismantling of 40 old units and installation of new 3-pipe Daikin’s VRV units.
Brain Park, EPAM, +5, Kraków, 5A Fabryczna Street
Water and sewage installation
CT-WL installation
Installation of fan coil units with condensate installation
Relocation of hydrants
Split air-conditioning installation for the server room
Area: 1516.50 square meters – 5th floor
Endorfina, Nowy Świat Department Store, 20 Krakowska Street, Rzeszów
Executive project
MIDEA VRF air conditioning installation – 15 INDOOR UNITS + 2
external power generating units
Installation of two MIDEA power generating units for AHUs with a power of 73 kW and 5.3 Kw
Installation of VTS supply and exhaust air handling unit
Implementation of a mechanical ventilation system for the needs of the club.
Moje Miejsce, Luneos, Dolny Mokotów, Warsaw
Ventilation installation
Heating and cooling installation
Server room air conditioning installation
Condensate drain installation
Hydrant installation
343 square meters of space
Moje miejsce, Ekaterra, Dziekoński Street, Warsaw
Air conditioning installation
Ventilation installation
Plumbing installation
Hydrant installation
Heating and cooling installation
Condensate drain installation
850 square meters of space
Brain Park, Aldi, Al. Pokoju, Kraków
Ventilation installation
CT/WL installation
Condensate drain installation
Plumbing installation
Air conditioning installation
1143.66 square meters
MidPoint71- Whoohoo, 9 Powstańców Śląskich street, Wrocław
Plumbing installation
Installation of comfort and fire ventilation
Technological heat
Ice water
560 square meters of space
LOFTMILL, Sagittarius Business House, 2 Sucha Street, Wrocław
Ventilation installation
Area 2 031 square meters
Unity Centre, Unity Square One, Dyson, 20 A. Lubomirskiego Street, Kraków
Plumbing installation
Hydrant installation
Installation of VRF air conditioning in server rooms on floors 1 and 3
Ventilation installation
CT/WL installation for fan coil units with equipment delivery
Condensate drain installation
2250 square meters of space
Brain Park, PepsiCo, Aleja Pokoju, Kraków
Ventilation installation
Plumbing installation
CT/WL installation
Chilled water installation
Condensate drain installation
Installation of VRF air conditioning on 3 floors
1143.66 square meters
Intraco Prime, 2 Stawki Street, Warsaw
Ventilation installation
CT/WL installation for fan coils
Plumbing installation
Hydrant installation
Air conditioning installation
Area 3300 square meters
Logistics and warehouse park Kielce Centrum, The first building, 7 Robotnicza Street, Kielce
Hydrant installation
Installation of ventilation
Installation of air conditioning
Water and sewage installation with roof drainage
Underfloor sewage system
Gas boiler room and gas installation of heat radiators
Gas detection
Moje Miejsce, BOEHRINGER INGELHEIM, 3 Dziekońskiego Street, Warsaw
Installation of ventilation
Water and sewage installation
Installation of the heat pump run
Hydrant installation
Condensate drainage system
VRF air conditioning installation
1,300 square meters of space
Astra Park, 36 Solidarności Avenue , Kielce
Refitout and inventory of building B and the ground floor in building A.
Delivery and replacement of lighting fixtures for energy-saving ones.
Adaptation of the electrical installation to the modernized space.
Adaptation of the ventilation / air conditioning system to the modernized space.
Inventory and as-built design of ventilation and HVAC installations.
Performing measurements and adjustment of ventilation and HVAC installations.
MidPoint71- Electrolux Poland, 9 Powstańców Śląskich Street, Wrocław
Installation of ventilation
Installation of CT / WL for fan coil units
Water and sewage installation
Hydrant installation
Installation of air conditioning
Malta Office Park, A Building, 88 Baraniaka Street, Poznań
Dismantling the old chiller
Delivery and installation of a new device with a cooling capacity of 430kW.
Modernization and adaptation of the building installation to the needs of a new device.
MidPoint71- CitySpace, , 9 Powstańców Śląskich Street, Wrocław
Installation of comfort ventilation system
Installation of smoke exhaust
Installation of VRF + Split air conditioning
Technological heat
Ice water
Water and sewage installation
Echo Shopping Centre, Kielce, Świętokrzyska 20 Street
Gas installation
Water and sewage installation
Technological heat installation
Installation of ventilation
Rooftop replacement
Endorfina, Lublin, Diamentowa 29 Street
Detailed technical design
VRF Air Conditioning Installation
Ventilation installation with delivery and assembly of three Air Handling Units
Technological heat and water and sewage installation
1900 m2 of space
CH8, ZDM and BZRD, Warsaw, Chałubińskiego 8 Street
Design / Realization
Water and sewage installation
Installation of VRF and Split air conditioning
Installation of ventilation
Installation of chilled water for fan coils
3900 m2 of space
Hala Koszyki, Warsaw, Koszykowa 63 Street
Comfort ventilation
Fire ventilation
Electrical Installations
MidPoint71- canteen, Wrocław, Powstańców Śląskich 9 Street
Installation of comfort ventilation
Installation of smoke exhaust
Technological heat
Chilled water system
Water and sewage installation
MidPoint71- 3M GSC Poland, Wrocław, Powstańców Śląskich 9 Street
Installation of comfort ventilation
Installation of smoke exhaust
Installation of VRF + Split air conditioning
Technological heat
Chilled water system
Water and sewage installation
Podium Park A, Kraków, HEINEKEN, al. Jana Pawła II 43a
Water and sewage installation
Hydrant installation
Installation of ventilation
Air-conditioning installation of VRF and Split type
Business Campus, Kraków TTC, 114 Opolska Street
Ventilation and air conditioning installation
Water and sewage installation
Condensate drainage system
Heat pump circuit installation
1500 m2 of office space
X20 BUILDING, Warsaw, BLIK, 85/87 Czerniakowska Street
Ventilation installation
Chilled water and technological heat
Water and sewage installation
550m2 of space
HI Piotrkowska, Łódź NEW WORK, 155 Piotrkowska Street
Ventilation installation
Chilled water and technological heat
Water and sewage installation
372 m2 of space
Office Building Equator IV, Warsaw, 100 al. Jerozolimskie
Ventilation installation
Chilled water and technological heat
Water and sewage installation
430m2 of space
Browary Warszawskie, Warsaw MDDP Academy, 58 Grzybowska Street
Ventilation installation
Chilled water and technological heat
Water and sewage installation
450m2 of space
T-Mobile Office Park, Warsaw, T-Mobile, 12 Marynarska Street
Chilled water and technological heat
Fuzja, Łódź, 5/7 Ks. bp. W. Tymienieckiego Street
Hygroster ventilation of apartments
Residential and fire ventilation of the garage
6000m2 underground garage
Katowice Airport, T Terminal
Ventilation installation
Condensate drainage system
Water and sewage installation with fitting of sanitary whiteware
Hydrant installation
C.H. installation
1805m2 of space
Face2Face I and II, Katowice, Capgemini F2F I stage, II stage
Ventilation installation
Chilled water and technological heat
VRF and Split installations
6250m2 of space
Powiśle Power Plant, Warsaw, Vodeno, 42 Dobra Street
Ventilation and air conditioning installation
Condensate drainage system
Water and sewage installation
Hydrant installation
Technological heat and chilled water system installation
1800 m2 of space
Browary Warszawskie, 62 Grzybowska Street
Air conditioning installation based on the VRF system – passageways
Face2Face I and II, Katowice, Honeywell F2F I stage, II stage, 4 Grundmanna/ Żelazna Street
Ventilation and air conditioning installation
Condensate drainage system
Water and sewage installation
Hydrant installation
Technological heat and chilled water installation
9500 m2 of space
Sheraton Grand Warsaw Hotel, Warsaw, 2 Bolesław Prus Street
Ventilation and air conditioning installation
Condensate drainage system
Water and sewage installation
Hydrant installation
Heating and chilled water installation
Centeral heating installation
1600 m2 of space
Face2Face, Katowice Notary Office, 4 Grundmanna/Żelazna Street
Ventilation installation
Chilled water and technological heat
Water and sewage installation
1150 m2 of space
Face2Face I and II, Katowice, Silesian Analytical Laboratory, Grundmanna street/ Żelazna Street
Ventilation installation
Chilled water and technological heat
Water and sewage installation
Browary Warszawskie HEBE, 62 Grzybowska Street
Adaptation of water and sewage, ventilation and heating and cooling installations to the needs of the tenant.
100 m2 of space
Symetris Business Park, Łódź, Uniqua 86 Piłsudskiego Street
Installation of ventilation
Condensate drainage system
Water and sewage installation
heat pump circuit installation
70 m2 of space
Loft Hotel – Butik hotel in Kraków, 113 Dietla Street
Ventilation and VRF air conditioning installation
Condensate drainage system
Water and sewage installation
Central heating installation
Hydrant installation
Technological heat and chilled water installation
Symetris Business Park, Łódź, PKO Lesing S. A., 12 Konstruktorska Street
Ventilation installation
Condensate drainage system
Water and sewage installation
340 m2 of space
Ludwik Rydygier Specialist Hospital, Kraków, 1 Złota Jesień Street
Delivery and execution of the distribution of the ventilation system in the cytogenetics laboratory with the delivery of the ventilation unit
Moje Miejsce, Warsaw HAVAS, Beethoven and Idzikowski Street
VRF installation
Air conditioning of the server room
Provincial Police Headquarters, Warsaw 2 Nowolipie Street
HVAC installation
Air conditioning of the server room
Żerań Heat and Power Plant, Warsaw, 15 Modlińska Street
Ventilation installation
VRF air conditioning system
Symetris Business Park, Łódź, Solar Polska ltd., 86 Piłsudskiego Street
HVAC installation
1000 m2 of space
Browary Warszawskie WeWork, 62 Grzybowska Street
VRF installation
Air conditioning of the server room
Smoke exhaust system
Symetris Business Park, Łódź, Kantyna, 86 Piłsudskiego Street
HVAC installation
250 m2 of space
Browary Warszawskie L’OREAL, 62 Grzybowska Street
HVAC installation
Air conditioning of the server room
Symetris Business Park, Łódź Philips Lighting , 86 Piłsudskiego Street
HVAC installation
5500 m2 of space
Lubicz Business Centre, Kraków International Paper,23 Lubicz Street
Installation of ventilation
Installation of air conditioning
Chilled water installation
5000 m2 of space
BAROQUE food & style, 16 St. Jan Street
Restaurant / HVAC-R design & build installation / Conservator of monuments
Office Centre, Kraków, 67 Szlak Street
AUX VRF system with a total power of 60 kW and a total number of 18 indoor units.
5 Split air conditioners by AUX
Q22 Office Centre, Warsaw, al. Jana Pawła II
Installation of air conditioning
Installation of precision air conditioning
Opoczno Showroom / Galeria Echo, Kielce, 20 Świętokrzyska Street
Mechanical installation
Installation of smoke exhaust ventilation
Installation of air conditioning in the server room
Installation of technical heat
Coca Cola Beverages Polska ltd., Warsaw, 20 Annopol Street
Replacement of Carrier water chillers with a total capacity of more than 500 kW with surrounding infrastructure.
Apollo Split Business&Living, Kielce, Kancelaria Sochański i Wspólnicy, 5 Silniczna Street
Installation of Mitsubishi Heavy duct air conditioning
Distribution of ventilation wires
Installation of plenum boxes
Installation of ceiling diffusers
Installation of AIRZONE zone control
FUZJA, E05 Building, Łódź, 5/7 Ks. bp. W. Tymieniecki Street
Installation of ventilation
Installation of air conditioning
Q22 Office Building, Warsaw, Deloitte, al. Jana Pawła II
Change of the air conditioning system from two to three tubes
Private clients, Włoszczowice, Skarżysko-Kamienna, Smyków, Ruda Zajączkowska
LONGI 365 Wp Panels, Sharp 395 Wp Panels, Sharp 330 Wp Panels
HUAWEI Inverters, Solar Edge
Hydrosolar Inverters Bilcza near Kielce
Solar installation with a capacity of 49.72 kW mounted on the ground.
Jinko 440W panels – 113 pcs.
SUNGROW SG50CX inverter.
Ventus Apollo Business & Living Building, Kielce, AC GROUP ltd., 4A Aleja IX Wieków Kielc
Installation of air conditioning
Installation of ventilation
Water and sewage installation
Electrical installation
19.71 kW photovoltaic installation (2 installations x 9.855 kW), LONGI 365 Wp panels
54 pieces, HUAWEI Inverter
Moje Miejsce, Warsaw Tchibo, Networks!, Beethoven i Idzikowski Street
Installation of ventilation
Installation of air conditioning in the server room
Water and sewage installation
Heating and cooling installation based on heat pumps
Autocentrum –Authorised Dealer of Volkswagen, Kielce, 18 Zakładowa Street
Photovoltaic installation with a power of 49.72 kW mounted on the roof of the showroom
Jinko 440W panels – 113 pcs.
HUAWEI SUN2000-50KTL inverter