Learn about the investments we have co-created

Our projects

Face2Face, Katowice, Grant Thornton

Plumbing
Sewage installation
Fire protection installation
Condensate installation
Ventilation installation
CT and WL installation
Split air conditioning installation for the server room
Area: 1200 square meters

More
Resi4Rent, Łódź, 127 Kilińskiego Street

Feeding ventilation installation elements by crane:
– Systemair smoke exhaust fans
– bases for fans
– domestic installation fans
– Conlit insulation
– mineral wool insulation
– comfort and smoke exhaust ventilation ducts.

More
Quattro Business Park A, Kraków, 25 Al. Gen. Bora-Komorowskiego

Dismantling of 40 old units and installation of new 3-pipe Daikin’s VRV units.

More
Brain Park, EPAM, +5, Kraków, 5A Fabryczna Street

Water and sewage installation
CT-WL installation
Installation of fan coil units with condensate installation
Relocation of hydrants
Split air-conditioning installation for the server room
Area: 1516.50 square meters – 5th floor

More
Endorfina, Nowy Świat Department Store, 20 Krakowska Street, Rzeszów

Executive project
MIDEA VRF air conditioning installation – 15 INDOOR UNITS + 2
external power generating units
Installation of two MIDEA power generating units for AHUs with a power of 73 kW and 5.3 Kw
Installation of VTS supply and exhaust air handling unit
Implementation of a mechanical ventilation system for the needs of the club.

More
Moje Miejsce, Luneos, Dolny Mokotów, Warsaw

Ventilation installation
Heating and cooling installation
Server room air conditioning installation
Condensate drain installation
Hydrant installation
343 square meters of space

More
Moje miejsce, Ekaterra, Dziekoński Street, Warsaw

Air conditioning installation
Ventilation installation
Plumbing installation
Hydrant installation
Heating and cooling installation
Condensate drain installation
850 square meters of space

More
Brain Park, Aldi, Al. Pokoju, Kraków

Ventilation installation
CT/WL installation
Condensate drain installation
Plumbing installation
Air conditioning installation
1143.66 square meters

More
MidPoint71- Whoohoo, 9 Powstańców Śląskich street, Wrocław

Plumbing installation
Installation of comfort and fire ventilation
Technological heat
Ice water
560 square meters of space

More
LOFTMILL, Sagittarius Business House, 2 Sucha Street, Wrocław

Ventilation installation
Area 2 031 square meters

More
Unity Centre, Unity Square One, Dyson, 20 A. Lubomirskiego Street, Kraków

Plumbing installation
Hydrant installation
Installation of VRF air conditioning in server rooms on floors 1 and 3
Ventilation installation
CT/WL installation for fan coil units with equipment delivery
Condensate drain installation
2250 square meters of space

More
Brain Park, PepsiCo, Aleja Pokoju, Kraków

Ventilation installation
Plumbing installation
CT/WL installation
Chilled water installation
Condensate drain installation
Installation of VRF air conditioning on 3 floors
1143.66 square meters

More
Intraco Prime, 2 Stawki Street, Warsaw

Ventilation installation
CT/WL installation for fan coils
Plumbing installation
Hydrant installation
Air conditioning installation
Area 3300 square meters

More
Logistics and warehouse park Kielce Centrum, The first building, 7 Robotnicza Street, Kielce

Hydrant installation
Installation of ventilation
Installation of air conditioning
Water and sewage installation with roof drainage
Underfloor sewage system
Gas boiler room and gas installation of heat radiators
Gas detection

More
Moje Miejsce, BOEHRINGER INGELHEIM, 3 Dziekońskiego Street, Warsaw

Installation of ventilation
Water and sewage installation
Installation of the heat pump run
Hydrant installation
Condensate drainage system
VRF air conditioning installation
1,300 square meters of space

More
Astra Park, 36 Solidarności Avenue , Kielce

Refitout and inventory of building B and the ground floor in building A.
Delivery and replacement of lighting fixtures for energy-saving ones.
Adaptation of the electrical installation to the modernized space.
Adaptation of the ventilation / air conditioning system to the modernized space.
Inventory and as-built design of ventilation and HVAC installations.
Performing measurements and adjustment of ventilation and HVAC installations.

More
MidPoint71- Electrolux Poland, 9 Powstańców Śląskich Street, Wrocław

Installation of ventilation
Installation of CT / WL for fan coil units
Water and sewage installation
Hydrant installation
Installation of air conditioning

More
Malta Office Park, A Building, 88 Baraniaka Street, Poznań

Dismantling the old chiller
Delivery and installation of a new device with a cooling capacity of 430kW.
Modernization and adaptation of the building installation to the needs of a new device.

More
MidPoint71- CitySpace, , 9 Powstańców Śląskich Street, Wrocław

Installation of comfort ventilation system
Installation of smoke exhaust
Installation of VRF + Split air conditioning
Technological heat
Ice water
Water and sewage installation

More
Echo Shopping Centre, Kielce, Świętokrzyska 20 Street

Gas installation
Water and sewage installation
Technological heat installation
Installation of ventilation
Rooftop replacement

More
Endorfina, Lublin, Diamentowa 29 Street

Detailed technical design
VRF Air Conditioning Installation
Ventilation installation with delivery and assembly of three Air Handling Units
Technological heat and water and sewage installation
1900 m2 of space

More
CH8, ZDM and BZRD, Warsaw, Chałubińskiego 8 Street

Design / Realization

Water and sewage installation
Installation of VRF and Split air conditioning
Installation of ventilation
Installation of chilled water for fan coils
3900 m2 of space

More
TEDI, Opoczno, Inowłodzka Street

Split air-conditioning installation
Ventilation installation

More
Hala Koszyki, Warsaw, Koszykowa 63 Street

Comfort ventilation
Fire ventilation
Electrical Installations

More
MidPoint71- canteen, Wrocław, Powstańców Śląskich 9 Street

Installation of comfort ventilation
Installation of smoke exhaust
Technological heat
Chilled water system
Water and sewage installation

More
MidPoint71- 3M GSC Poland, Wrocław, Powstańców Śląskich 9 Street

Installation of comfort ventilation
Installation of smoke exhaust
Installation of VRF + Split air conditioning
Technological heat
Chilled water system
Water and sewage installation

More
Podium Park A, Kraków, HEINEKEN, al. Jana Pawła II 43a

Water and sewage installation
Hydrant installation
Installation of ventilation
Air-conditioning installation of VRF and Split type

More
Business Campus, Kraków TTC, 114 Opolska Street

Ventilation and air conditioning installation
Water and sewage installation
Condensate drainage system
Heat pump circuit installation
1500 m2 of office space

More
X20 BUILDING, Warsaw, BLIK, 85/87 Czerniakowska Street

Ventilation installation
Chilled water and technological heat
Water and sewage installation
550m2 of space

More
HI Piotrkowska, Łódź NEW WORK, 155 Piotrkowska Street

Ventilation installation
Chilled water and technological heat
Water and sewage installation
372 m2 of space

More
Office Building Equator IV, Warsaw, 100 al. Jerozolimskie

Ventilation installation
Chilled water and technological heat
Water and sewage installation
430m2 of space

More
Browary Warszawskie, Warsaw MDDP Academy, 58 Grzybowska Street

Ventilation installation
Chilled water and technological heat
Water and sewage installation
450m2 of space

More
Face2Face I and II, Katowice, Orange F2F stage II

Ventilation installation
3030m2 of space

More
Fuzja, Łódź, 5/7 Ks. bp. W. Tymienieckiego Street

Hygroster ventilation of apartments
Residential and fire ventilation of the garage
6000m2 underground garage

More
Katowice Airport, T Terminal

Ventilation installation
Condensate drainage system
Water and sewage installation with fitting of sanitary whiteware
Hydrant installation
C.H. installation
1805m2 of space

More
Face2Face I and II, Katowice, Capgemini F2F I stage, II stage

Ventilation installation
Chilled water and technological heat
VRF and Split installations
6250m2 of space

More
Powiśle Power Plant, Warsaw, Vodeno, 42 Dobra Street

Ventilation and air conditioning installation
Condensate drainage system
Water and sewage installation
Hydrant installation
Technological heat and chilled water system installation
1800 m2 of space

More
Browary Warszawskie, 62 Grzybowska Street

Air conditioning installation based on the VRF system – passageways

More
Face2Face I and II, Katowice, Honeywell F2F I stage, II stage, 4 Grundmanna/ Żelazna Street

Ventilation and air conditioning installation
Condensate drainage system
Water and sewage installation
Hydrant installation
Technological heat and chilled water installation
9500 m2 of space

More
Sheraton Grand Warsaw Hotel, Warsaw, 2 Bolesław Prus Street

Ventilation and air conditioning installation
Condensate drainage system
Water and sewage installation
Hydrant installation
Heating and chilled water installation
Centeral heating installation
1600 m2 of space

More
Face2Face, Katowice Notary Office, 4 Grundmanna/Żelazna Street

Ventilation installation
Chilled water and technological heat
Water and sewage installation
1150 m2 of space

More
Face2Face I and II, Katowice, Silesian Analytical Laboratory, Grundmanna street/ Żelazna Street

Ventilation installation
Chilled water and technological heat
Water and sewage installation

More
Browary Warszawskie HEBE, 62 Grzybowska Street

Adaptation of water and sewage, ventilation and heating and cooling installations to the needs of the tenant.
100 m2 of space

More
Symetris Business Park, Łódź, Uniqua 86 Piłsudskiego Street

Installation of ventilation
Condensate drainage system
Water and sewage installation
heat pump circuit installation
70 m2 of space

More
Loft Hotel – Butik hotel in Kraków, 113 Dietla Street

Ventilation and VRF air conditioning installation
Condensate drainage system
Water and sewage installation
Central heating installation
Hydrant installation
Technological heat and chilled water installation

More
Symetris Business Park, Łódź, PKO Lesing S. A., 12 Konstruktorska Street

Ventilation installation
Condensate drainage system
Water and sewage installation
340 m2 of space

More
Bank Spółdzielczy, Końskie, 7 Zamkowa Street

Ventilation and VRF air conditioning installation

More
Ludwik Rydygier Specialist Hospital, Kraków, 1 Złota Jesień Street

Delivery and execution of the distribution of the ventilation system in the cytogenetics laboratory with the delivery of the ventilation unit

More
Moje Miejsce, Warsaw HAVAS, Beethoven and Idzikowski Street

VRF installation
Air conditioning of the server room

More
Provincial Police Headquarters, Warsaw 2 Nowolipie Street

HVAC installation
Air conditioning of the server room

More
Żerań Heat and Power Plant, Warsaw, 15 Modlińska Street

Ventilation installation
VRF air conditioning system

More
Malta Office Park, Poznań, 88 Baraniaka Street

Replacement of the 460kW CO2 water chiller

More
Browary Warszawskie WeWork, 62 Grzybowska Street

VRF installation
Air conditioning of the server room
Smoke exhaust system

More
Browary Warszawskie L’OREAL, 62 Grzybowska Street

HVAC installation
Air conditioning of the server room

More
Lubicz Business Centre, Kraków International Paper,23 Lubicz Street

Installation of ventilation
Installation of air conditioning
Chilled water installation
5000 m2 of space

More
BAROQUE food & style, 16 St. Jan Street

Restaurant / HVAC-R design & build installation / Conservator of monuments

More
Office Centre, Kraków, 67 Szlak Street

AUX VRF system with a total power of 60 kW and a total number of 18 indoor units.
5 Split air conditioners by AUX

More
Q22 Office Centre, Warsaw, al. Jana Pawła II

Installation of air conditioning
Installation of precision air conditioning

More
Opoczno Showroom / Galeria Echo, Kielce, 20 Świętokrzyska Street

Mechanical installation
Installation of smoke exhaust ventilation
Installation of air conditioning in the server room
Installation of technical heat

More
Coca Cola Beverages Polska ltd., Warsaw, 20 Annopol Street

Replacement of Carrier water chillers with a total capacity of more than 500 kW with surrounding infrastructure.

More
Apollo Split Business&Living, Kielce, Kancelaria Sochański i Wspólnicy, 5 Silniczna Street

Installation of Mitsubishi Heavy duct air conditioning
Distribution of ventilation wires
Installation of plenum boxes
Installation of ceiling diffusers
Installation of AIRZONE zone control

More
FUZJA, E05 Building, Łódź, 5/7 Ks. bp. W. Tymieniecki Street

Installation of ventilation
Installation of air conditioning

More
Q22 Office Building, Warsaw, Deloitte, al. Jana Pawła II

Change of the air conditioning system from two to three tubes

More
Private clients, Włoszczowice, Skarżysko-Kamienna, Smyków, Ruda Zajączkowska

LONGI 365 Wp Panels, Sharp 395 Wp Panels, Sharp 330 Wp Panels
HUAWEI Inverters, Solar Edge

More
Hydrosolar Inverters Bilcza near Kielce

Solar installation with a capacity of 49.72 kW mounted on the ground.
Jinko 440W panels – 113 pcs.
SUNGROW SG50CX inverter.

More
Ventus Apollo Business & Living Building, Kielce, AC GROUP ltd., 4A Aleja IX Wieków Kielc

Installation of air conditioning
Installation of ventilation
Water and sewage installation
Electrical installation
19.71 kW photovoltaic installation (2 installations x 9.855 kW), LONGI 365 Wp panels
54 pieces, HUAWEI Inverter

More
Moje Miejsce, Warsaw Tchibo, Networks!, Beethoven i Idzikowski Street

Installation of ventilation
Installation of air conditioning in the server room
Water and sewage installation
Heating and cooling installation based on heat pumps

More
Q22 Office Centre, Warsaw, Apsys, al. Jana Pawła II

Arrangement of the lease area of 1,200 m2

More
Autocentrum –Authorised Dealer of Volkswagen, Kielce, 18 Zakładowa Street

Photovoltaic installation with a power of 49.72 kW mounted on the roof of the showroom
Jinko 440W panels – 113 pcs.
HUAWEI SUN2000-50KTL inverter

More